01 Description
Following a USD 2.0 million refit completed in 2024, this tri-deck motoryacht is presented in exceptional condition, with extensive upgrades throughout. Originally built at 121 feet, FAVOR was professionally extended to 127 feet after construction, creating a significantly larger aft deck and additional crew. She also delivers impressive performance, powered by twin MTU diesel engines that provide both reliability and efficiency.
Her hull and superstructure are constructed of fiberglass.
The skylounge aft deck, main aft deck, cockpit, and swim platform are finished in teak planking, while the side decks, foredeck, and flybridge feature non-skid surfaces.
FAVOR comfortably accommodates up to 10 guests overnight in 5 staterooms.
02 Specifications
Basic boat information
- Builder CRESCENT
- Boat Name FAVOR
- Year 2000
- Condition Used
- Category Motor Yacht
- Construction Fiberglass
Dimensions
- Overall Length 127' 1"
- Beam 25'
- Max. Draft 6' 1"
- State Rooms 5
03 Additional info
CONSTRUCTION
DIMENSIONS
General
Speed, Consumption, Range & RPMs
MACHINERY
Main Engines
Engine Hours:
Generators: (2) Northern Lights M439T
COMMUNICATION, NAVIGATION & ENTERTAINMENT SYSTEMS
Radar/GPS/Chart Plotter:
Engine Displays: (2) DDEC
TV’s:
GALLEY & LAUNDRY EQUIPMENT
Main Galley Equipment
DECK EQUIPMENT
Anchor Windlass System: (2) Maxwell 4500
SECURITY, FIRE FIGHTING & SAFETY EQUIPMENT
Security Equipment
Fire Extinguishers: (5) ABC type
ACCOMMODATIONS
GENERAL
UPGRADES
2026• Bottom painted
• Shafts and props balanced
• Cutlass bearings renewed
• Shaft seals renewed, with spares included
• Rudders dropped and resealed
• Replaced 32 new injectors and EUP’s
• New fuel lines
• Port generator rebuilt
• Starboard generator 2000-hour service completed
• Hull ceramic coated from waterline to rub rail
• Anchor chain dropped and marked
• Anchor chute polished
• New air handlers installed in the salon and master stateroom
• (2) New washers installed
• (2) New dryers installed
• Depth finder and Radar replaced in pilothouse
2025
• 5-year Class survey completed - April
• Stabilizers dropped and serviced - April
• Anchor winches rebuilt by High Seas - April
• Shafts pulled and balanced – April
• Port power take-off (PTO) rebuilt - April
2024/ REFIT
•OVER USD 2 MILLION SPENT ON MAJOR REFIT
Exterior & Deck Upgrades
• Entire superstructure repainted from the rub rail upward – USD 380,000
• Flybridge reconfigured – Added Jacuzzi, custom sunbeds, seating, and umbrellas - Jacuzzi: USD 153,000
• New teak decks installed on skylounge aft deck, cockpit, stairs and swim platform – USD 166,275
• Exterior cushions and canvas updated – USD 72,000
• Some interior and exterior lighting upgraded – USD 22,000
Interior Enhancements
• New carpet, wall coverings, and soft goods throughout – USD 35,000
• New furniture, mattresses and bedding throughout – USD 45,000
• New headliner installed in the salon, skylounge and master stateroom
• New marble countertops installed in the salon and skylounge
• Salon and skylounge woodwork refinished – Select areas re-stained
• Queen berth added in one VIP guest stateroom
Mechanical & Vessel Systems
• Sewage treatment plant upgraded – USD 58,500
• Watermakers, air conditioning, plumbing and electrical systems upgraded – USD 22,000
• Many of the air handlers replaced
• Major service on generators
• Steering rebuilt
• New batteries installed
Navigation, Connectivity & Monitoring
• All new bridge electronics installed – USD 110,000
• New helm controls installed
• New Garmin Radar/GPS installed
• New A/V, networking, and IT throughout – USD 42,000
• Remote access to vessel monitoring added – USD 10,000
• Starlink connectivity added
Class & Certification
• PYLC and Bureau Veritas Class certification attained – USD 32,000
2023
• Both watermakers were rebuilt - $120,000
• Air Conditioning System upgraded – (3) of (4) compressors and drive system replaced
• Both raw water pumps replaced
• Exhaust system serviced: Inspected, rewrapped, and fitted with new hoses
• Bottom sandblasted and re-epoxied
• Both Genny PTO’s rebuilt
• Davit rebuilt
• Passerelle rebuilt
• Systems monitor and fire monitor rebuilt
• Aft Capstans rebuilt
• New battery chargers installed
• All VacuFlush head pumps replaced
2020
• All new LED underwater lights were done