01 Description
S/Y LEGEND is a proven world cruiser, having recently completed an extraordinary circumnavigation for her current owner, an impressive bucket-list achievement that speaks to her capability, reliability, and comfort at sea. Following this global voyage, she is now in Savannah, Georgia, undergoing a comprehensive refit to further enhance her condition and onboard systems.
Designed by renowned naval architect Ron Holland, this 112’ Alloy Yacht is a striking example of classic sailing pedigree. Maintained to an exceptional standard by knowledgeable owners and crew, LEGEND has benefited from significant refits in 2016 and 2022, with further upgrades currently underway. Presented in pristine condition, she represents one of the finest yachts of her size on the market. Her performance credentials are equally impressive, including a clean sweep of all three races in her class at the 2019 St. Barths Bucket—won by the largest cumulative margin in the event’s history.
LEGEND accommodates guests in three well-appointed aft staterooms, including a full-beam master, a port double, and a convertible starboard cabin. The master suite features a walk-around queen berth, an L-shaped settee, bureau, and a split en suite with a marble shower and separate WC. Forward of the galley, crew quarters comfortably accommodate four to five, complete with a dedicated crew mess.
A standout feature is her dual-cockpit layout, offering both a private owner’s cockpit aft and a spacious center cockpit ideal for socializing, dining, and comfortable sailing. The helm is positioned just aft, with easy access to the side decks.
Her interior is both elegant and inviting, featuring a low-profile raised deck salon/pilothouse and a generous full-beam lower salon. Finished in rich teak joinery with refined soft furnishings, the space is bright, airy, and exceptionally well-ventilated throughout.
02 Specifications
Basic boat information
- Builder ALLOY YACHTS
- Boat Name LEGEND
- Year 1998
- Condition Used
- Category Cruising Ketch
- Construction Aluminum
Dimensions
- Overall Length 112'
- L.W.L 88' 9"
- Beam 24'
- Max. Draft 11'
- State Rooms 3
03 Additional info
MAIN SPECIFICATION
Length Overall:
Length at Waterline:
Beam:
Year Completed:
Model Year:
Refit:
Type:
HIN:
Tonnage:
Displacement:
Hull Config:
Flag:
Crew:
CONSTRUCTION
Builder:
Naval Architect:
Interior Design/Stylist:
Hull Material:
Deck Material:
Classification:
SPEED
Maximum:
Cruising:
CAPACITIES
MACHINERY & EQUIPMENT
Inverters: 4 x Mastervolt Mass Sine 24/5000
Inverter 1: 2016
Stern Thruster: ABT Magnum 16” 110 HP (New motor April 2023)
Fuel Filtration: Parker Hannifin FBO-10-MA Fuel/Water Separator
2 x Parker 75-1000Max Fuel/Water Separtor with sensor
4x Parker 75-500Max Fuel/Water Separtor with sensor
Sewage System: Hamann - HL-CONT - 01m³/Mini L-Frame
- Hydraulic Oil: 71 gallons (270 liters) integral to hull to help keep oil cool
- 1 x 28 cc – 7.5 kW AC electric motor (January 2023), Battery powered through 3 x Victron, Phoenix Inverter 24/5000watt, 3 phase
- 2 x Generator driven PTO 71cc pumps (January 2023)
- Stainless braided hoses on deck (July 2022)
SAILS & RIGGING
Aluminum Masts by Matrix of NZ Main mast is a 4-spreader keel-stepped with jacking system Mizzen mast is a 3-spreader deck stepped with jacking system In Booms furling by Marten Spars, Carbon fiber roller furling with hydraulic motor outboard end. Spinnaker and tender lift poles (2016) in Carbon and aluminum fittings. Running rigging, Marlow MGP Tech 50 on a rolling renewal program. Rig Survey completed by Rig Pro November 2024 with all recommendations completed in February 2025 – report Available
Reckmann Hydraulic Furlers on headstay and staysail (serviced by OEM December 2021) Reckmann Main Boom Vang (2019, serviced October 2023) Mizzen Boom Vang (serviced December 2021) Main Boom Hydraulically powered boom mandrill and lock (replaced by RigPro Feb 2025) Mizzen Boom Hydraulically powered boom mandrill and lock (serviced 2021) 6 x Lewmar 77 3-speed hydraulic self-tailing 6 x Lewmar 88 3-speed hydraulic self-tailing 2 x Lewmar 122 3-speed with back wind hydraulic self-tailing Harken stainless Blocks Spinlock jammers
Nilsson CRW 18; main halyard (rebuilt 2016) Nilsson CRW 18; Main sheet (rebuilt 2016)
Mainsail: North 3Di Ocean 700 (New May 2022, serviced December 2024) Mizzen: North 3Di Ocean 700 (New December 2021, Serviced December 2024) Yankee: North 3Di Ocean 700 (New December 2021, Serviced December 2024) Staysail: North 3Di Ocean 700 (New in December 2021, Serviced December 2024) Gennaker: North G1 AP Gennaker Norlon (New March 2024, Serviced March 2026) Mizzen Staysail: North Helix on “Top Down Furler”(New March 2024,Serviced December 2024) C-Tech SnuffAir snuffer for G1 Gennaker. (New December 2024) Race Genoa: Doyle Stratis Carbon Ice (New in 2016, Serviced January ’23, Stored Since) Genoa: Doyle Stratis (New in 2012, Serviced June 2019, Stored since) A2: Doyle (New in 2015, Serviced June ‘19, Stored since) A2: Doyle (New in 2012, Serviced June ‘19, Stored since) A3: Doyle (New in 2013, Serviced June ‘19, Stored since) C-Tech SnuffAir Snuffer for A sails with spare bladder. (Serviced June 2019, stored since) Mizzen Staysail (Small): Doyle (New in 2015, serviced January ’23, Stored Since) Mizzen Staysail (Large): Doyle (New in 2012, Serviced June ‘19, Stored since)
2 x Simpson Lawrence vertical hydraulic windlass. (Rebuilt November 2024) 140 meters Port and 100 meters Starboard of 16mm chain (2016) 2/136 kg custom Alloy Yachts stainless steel plow anchors, Swivel’s replaced (2020) Fortress FX125 aluminum (spare anchor Handheld controls, (replaced and rewired 2021)
COMMUNICATION AND NAVIGATIONAL EQUIPMENT
Upgrade, replacement and rewiring of Communication and Navigation equipment (January 2022)
AIS:
Radar 1:
Radar 2:
Gyro:
Fluxgate Compass:
Sailing Instruments:
Ethernet to ships network and A&T displays. Fastnet to B&G Displays.
2x A&T ATAWA Analogue Apparent Wind Angle (December 2022)
4 x B&G H3000 GFD
2 x Airmar Speed/Water Temp
2 x Airmar Depth sensor with A&T“Auto Tack” box (May 2022)
Secondary Airmar Depth sounder on center line (January 2022)
Interfaced to ships Network (January 2022)
Computer System:
Network:
5 x Ubiquity AC6LR Wifi 6 enabled Wifi access points (December 2021)
2 x Moxa Serial Servers (December 2021)
Auto Pilot:
to NAV Data.
ENTERTAINMENT SYSTEMS
TV: Samsung – The Frame 50inch TV (November 2021)
Soundbar: Samsung – The Terrace (November 2021)
Streaming: Apple TV Network Prioritised (2018)
Media Server: QNAP TS-653D 32TB Raid Storage running Plex (December 2021)
Network Switch: Netgear GS110MX 5 Gigabit Switch (December 2021)
Music: 6x Fusion RA70 Bluetooth Stereo’s (January 2022)GALLEY & LAUNDRY EQUIPMENT
MAIN GALLEY EQUIPMENT
Cooktop:
Oven:
Microwave:
Refrigerator:
Freezers:
Ice Maker:
SALON EQUIPMENT
COCKPIT EQUIPMENT
LAUNDRY
Washing Machines:
Dryers:
SECURITY, FIRE FIGHTING AND SAFETY EQUIPMENT
- Triton Vessel Management Software:, work lists, preformed, and schedules and running logs. Management of all documentation, manuals, operation guides, drawings, schematics and plans.
- 2 x PTZ network cameras mounted on lower main mast spreaders
- 2 x PTZ network cameras mounted on lower mizzen mast spreaders
- 2 PTZ network cameras mounted in the engine room.
- Gas detector in galley with 2 x zones (December 2024)
- Gas system checked and certified December 2024
- Haes Fire Detection system (December 2022)
- Fire bells: engine room, wheel house, forward accommodation, aft accommodation, forepeak and lazarette.
- Smoke detectors: lazarette, each guest and crew cabin, upper saloon, lower saloon, crew mess, forepeak and gas locker. (December 2022)
- Heat detectors both engine room and galley
- Emergency fuel cutoff
- Engine room vent close levers
- Novec Bottle (45kg) and Novec Nozzles (2016)
- Fire blankets in galley and engine room. (December 2022)
- Fire extinguishers throughout vessel.
- Life Rafts: 2x 8-man SOLAS “A” Zodiac; 16-man SOLAS “B” Zodiac (2018, inspected December 2022)
- Personal MOB Packs worn at sea with AIS PLB smoke and hand flair
- 2x Jon Buoy Man Overboard units
- G-EPIRB (new August 2021)
- SART (new November ’25)
- Life Jackets: 12 x Crewsaver 190 OS (SOLAS)
- Life Rings: 2x life rings with strobe, MOB strobe and smoke signal
- 2 x SCBA (2019 and 2022) and fire fighting bunker gear
- International running lights
- Escape for Engine Room and forward and aft cabins
- Kahlenberg D2 Horn
OVERVIEW
REFITS & WORKS PERFORMED AND PENDING
March- May 2026 Savannah, GA, USA
- North 3Di Mainsail (Delivery August 2026)
- North 3Di Yankee (Delivery August 2026)
- North Helix Structured Luff Mizzen Staysail Delivery August 2026)
- Harken custom Main Vang painted in Alexseal Matterhorn White (Delivery September 2026)
- Harken custom Mizzen Vang painted in Alexsea Matterhorn White (Delivery September 2026)
- Autopilot Rams replaced new custom pins fabricated - Pending
- Autopilot motors/pumps (x2) removed serviced and repainted - Pending
- Generators 2000 hour service by Northern Lights
- Main engine W5 Service by MTU
- Grey, Black, Water and Fuel tanks cleaned and inspected – Pending
- Freshwater accumulators replaced -Pending
- Tender Engine Serviced - Pending
- G1 Spinnaker serviced by North Charleston
- Hull antifouled
- Aft Cockpit Bimini Replaced – Pending
- Fwd Cockpit sides replaced – Pending
- Cockpit Caprails spray varnished - Pending
- Cockpit Tables spray varnished – Pending
- Anchor chain painted
- Main sheet Replaced
- Main Halyard Replaced
- Tender Lifting Strop Replaced
- Interior stairs re-veneered - Pending
- Interior paint and varnish touch ups -Pending
- All guest and crew mattresses cleaned and sanitised.
- Caprail full stripped to bare wood and revarnished
- Aft cockpit recaulked and sanded.
- Windlasses Stripped and serviced.
- Steering cables replaced
- Generators 1000 hour service.
- Main engine W3 Service
- Mizzen VHF aerial replaced
- X-Band Radar Magnetron and motor bushes replaced.
- Stb Helm Screen replaced
- 3 x A&T 30/20 displays replaced
- 1 x A&T Autopilot head replaced
- Yankee and staysail foil replaced by RigPro
- Yankee, Staysail, Mizzen Staysail (new Future Fibers Torsion Cable) and G1 spinnaker Serviced by North Cape Town
- All winches and Blocks striped/cleaned/inspected and rebuilt.
- Teak Planks replaced on foredeck hatch
- Windlasses serviced
- All crew and guest mattresses cleaned and sanitized.
- Prop shaft pulled and bearings replaced
- Rudder bearing replaced
- Main Engine W4 service
- Main Engine mounts replaced
- Main Engine coupling replaced
- Main Engine Laser aligned
- Main Engine exhaust system cleaned and sensors added
- Bow thruster motor replaced
- Windlass motors serviced, sand blasted, repainted and hoses replaced
- Autopilot rams serviced and painted
- All pumps serviced
- Fuel tanks cleaned
- Black tanks cleaned
- Grey tank cleaned
- Water tanks inspected
- Seacocks checked and serviced/replaced as required
- Water Maker HP pump serviced
- Hydraulic pump Frequency drive replaced
- Helm control panel replaced by IMED
- Automatic Door system rebuilt with New IMED PLC control system
- Shore Power System serviced
- Generator 2000 hour service including Turbo rebuilds
- Aft Hot water elements replaced
- Rig inspected by RigPro
- Main Boom fairings modernized to cope with modern sails.
- Main Boom Mandrel replaced with 70% Stiffer Carbon , gearbox motor and bearing replaced.
- Sails serviced by North
- Teak deck sanded
- New Cockpit Bimini and Helm Bimini
- Wheel Leather replaced
- 2x Mizzen Staysail Halyards replaced
- All Winches taken down to component parts and rebuilt.
- All Blocks rebuilt
- Transom Door Platform serviced and repainted
- Lazzerete and forepeak repainted
- Obsolete Winch and deck buttons replaced with Harken stainless
- Mizzen Staysail mast head blocks with Harken Stainless
- Caprail Varnished
- Marble surfaces Professionally polished
- Air con heaters serviced
- Aircon Ducts cleaned
- Galley extractor ducts cleaned
- Galley Faucet replaced
- Mattresses cleaned/disinfected through out.
- Main Engine and Generator exhaust pipes replaced
- Generator 10,000 hour service
- Fridge pumps Replaced
- Aft Freshwater pump replaced
- Windlasses Rebuilt.
- Cap Rails Varnished
- North G1 Spinnaker and gear fitted
- North Mizzen Staysail and gear fitted
- Interior paint touch ups and varnishing
- Generator PTO pumps replaced (January 2023)
- Air conditioning Condenser Coils and Evaporators replacement. (February)
- 2nd 3 phase Autopilot pump fitted with soft start valves (February)
- Watermaker membranes replaced (March)
- PLC and AMS system upgrade (March)
- Lube oil dispensing pump and lines upgrade (March)
- Stern Thruster Motor replaced (April)
- Electric Hydraulic pump replaced
- Freshwater pump replaced (April)
- Sewage plant pumps replaced (October)
- Interior doors varnished (February)
- Sockets/Outlets and Light Switches replaced (February)
- Forepeak water tight door repaired and repainted (February)
- Engine room floorboards repainted (February)
- Crew Cabin reading lights replaced (March)
- Various interior Varnish and finish repairs (February)
- Mooring Lines replaced (February)
- Small Main Cockpit Table Replaced (February)
- Exterior tables Varnished (February)
- Tender Cover replaced (February)
- Zip in Sunshades for Main cockpit supplied (February)
- Various exterior paint repairs (March)
- Caprails varnished (March)
- New Main Halyard, Genoa sheets, Main sheet, Main runners (February)
- Hull sanded and Antifouled (April)
- Refrigeration works:
- 2 New Raw water supply pumps (October 2022)
- 2 New Compressors for the Veg Cooler and the Galley Fridge (October 2022)
- New control box for Entire refrigeration system, new wiring and components. (January 2023)
- Waste tank refit including (October 2022)
- Aft and Forward Black water tanks and Grey water tank emptied, cleaned professionally.
- Black Water Tanks sandblasted and recoated – report available
- Sensors cleaned and checked
- Blowdown fitted to Grey tank sensor to eliminate fowling in the tube and false reading provided.
- Main Engine control box rewired by IMED – Original Contractor when yacht was built. October 2022)
- Underwater Lights replaced (October 2022)
- Cap rails Varnished (July 2022)
- Main Engine oil filter housing replaced. (July 2022)
- Shaft Pulled and Prop Inspected and all regreased (October 2022)
- Cutlass bearing and shaft seals with spare installed (October 2022)
- Shaft cooling monitoring upgraded for new pipework and clear paddle wheel monitoring with new IFM Sensor (November 2022)
- Watermaker Large bag filter installed (July 2022)
- Stern thruster motor removed and rebuilt and bench tested (October 2022)
- Elbow unions for bow thruster replaced and coated with Tectyl corrosion protection (December 2022)
- All 24v Bilge pumps cleaned and tested and new sensor hoses run and secured. (December 2022)
- Large ceramic filter fitted to Galley drinking tap (July 2022)
- Captains desk leather reconditioned (December 2022)
2021/2022 – 8 Month Refit at Thunderbolt Marine, Savannah, GA
- Full repaint of hull and deck
- Teak Deck replaced throughout with 19 mm Teak by TeakDecking Systems.
- Pilot house fully rewired. New switch panels, fuse blocks, unused cables removed, drawings updated. Designed and completed by IMED – Original contractor from when yacht was built.
- Electrical Junction Box in Forepeak rewired by IMED
- Radio Battery Junction Box redesigned and rewired by IMED with new DC to DC charger and AC to DC charger
- Electrical Junction Box in Lazarette rewired by IMED
- Full electronic upgrade of Navigation, Sailing Instruments and Autopilot. New Carbon Fibre mounting panel. System fully rewired during install. See spec list for individual components.
- Full computer and network upgrade to modern standards of speed and size.
- All deck fittings, winches, blocks, etc fully stripped back to individual components, serviced, machine polished.
- All cap rails and cockpit tables varnished.
- All anodes replaced
- Fuel tanks cleaned
- Fuel tank hull plates replaced as pre survey recommendation.
- Helm station wheel gears and locks rebuilt.
- Main Engine:
- W5 service April 2021 @4500 hours including:
- New raw water pump
- New Cylinder Heads
- Coolant Pump rebuilt with new parts
- Intercooler Serviced
- Valve gear serviced
- New injectors
- Turbos rebuilt with new parts
- Exhaust lagging replaced
- Full service report available on request.
- Gearbox replaced with a ZF 501A (August 2021)
- Hundested Pitch Framo, potentiometer and gear motor replaced (December 2020) Shaft and propeller pulled and measurements sent to Hundested for tolerance checks. All with in tolerance. Serviced and refitted. (December 2021)
- 10,000 hour service for both Generators @7400hours including:
- Replace and rebuild cylinder head
- Replace Raw Water Pump
- Rebuild Turbo
- Replace Injectors
- Replace rubber seals/joints and washers in fuel system
- Replace raw water hoses/clamps
- Replace coolant hoses and coolant
- Replace thermostats
- Clean heat exchangers
- Replace belts
- Replace exhaust mixing elbow
- Rebuild injector pumps
- Change fluids, filters
- Windings megger measurements.
- Silicon exhaust piping replaced.
- Rudder bearing, (Machined DuraBlue) and rudder shaft seals replaced (October 2021)
- New Plumping for Refrigeration system from Engine room Supply to Through hull discharge. New PVC with Strainers and Valves
- All Thru-hull valves of the vessel replaced. (October 2021)
- Lube Oil Tank cleaned, pressure tested and sensor replaced
- Watermaker rebuild including
- New High Pressure pump and Feed Pump
- Replacement of high and low pressure switches
- Rebuild of valves/solenoids
- Rewire of control box
- Fresh water flush system added
- Membranes replaced (August 2020)
- New windlasses installed with new custom parts from OEM in New Zealand. New hydraulic motors installed (December 2022)
- Bilge Stripping system service including:
- Hydraulic bilge pump head replaced
- 400v Bilge pump head and motor replaced
- Pipes and joins checked
- Relabeled.
- Complete replacement of all House Batteries 24 x 2v, 1200Ah
- Battery charger 1 replaced (Dec 2021)
- Battery charger 2 replaced (Feb 2022)
- New Air compressor fitted, associated piping replaced and manifold distribution board rebuilt (December 2022)
- Stern thruster seal replaced (December 2022)
- Mechanical locking mechanism for bow thruster fitted to secure at sea on long voyages
- Air Conditioning system rebuild including:
- 2 new Bitzer compressors (April 2021)
- All insulation ducting professionally cleaned/disinfected (July 2021)
- All air handlers removed, cleaned, serviced, rewired, reinsulated and bench tested (October 2021)
- Salt water pump replaced (December 2021)
- Fresh Water System Upgrades including:
- Freshwater tanks cleaned/disinfected
- Drinking faucet and ceramic filter fitted to master cabin (November 2020)
- Fresh water pump installed and second pump given full service (November 2021)
- 2 x fresh water accumulators replaced
- Inline hot water booster for colder climates installed (November 2020)
- Hot water piping replaced in guest areas.
- Full service of the ASEA shore power unit.
- Hard switches for Waste pumps installed as a fail safe (November 2021)
- Toilets removed and serviced.
- Diaphragms on Grey pump and Fwd Black pump replaced (January 2022)
- Stove replaced. Gas hob and electric oven. Gimbal system overhauled. (January 2022)
- LPG pipe to stove replaced (January 2022)
- Galley extractor fan rebuilt and ducts cleaned out. (November 2021)
- LPG detection system for galley replaced with 2 x sensing positions April (2021)
- Fire Detection System replaced across whole boat. New Smoke sensors, new control panel, new break glass activation points
- Combination/Microwave oven replaced with Miele (January 2022)
- Washing machine replaced with Miele (January 2022)
- Port light seals replaced (April 2022)
- Main Companionway entrance automatic system overhauled and rewired. (February 2022)
- Forepeak hatch rams replaced (January 2022)
- Shelves added to forepeak for secure spare parts storage.
- Anchor launcher pin redesign.
- Forward, aft and guest cabin bilges repainted
- Interior works including:
- New Lower Salon sofa shapes and upholstery
- New Upper salon sofa shape and upholstery
- Ottoman fitted to lower salon
- Full Galley refit, painted cabinets, new floor, appliances replaced
- Crew mess, repainted, upholstered and table varnished
- Crew cabins headliners painted, mattresses replaced, floor replaced
- Floors replaced in Starboard and Port Guest cabins
- Bed Headboards replaced in all guest cabins
- Sconce light fittings replaced throughout
- Storage cupboards fitted out with Perspex for glassware
- Guest cabin mattresses replaced (April 2021)
- Headliner repairs and varnishing
- Hatch surrounds repair and varnishing
- Hand rail repair and varnishing
- Tables varnished
- Air con vents repaired and varnished
- Ventilation ducting cleaned/replaced
- Insulation in upper saloon and guest areas replaced
- Shower mixers replaced
- Remote control blinds fitted to guest cabins and bathrooms
- Floor rugs replaced
- Upper Salon windows tinting replaced and edges resealed.
- Complete replacement of all House Batteries 24 x 2v, 1200Ah
- Cockpit cushions recovered and new foam inners for seats and backs designed and built.
- Various high quality canvas works carried out on a rolling basis.
- Rigs pulled for 5 year service, fully disassembled and NDT tested.
- Rigs, Booms and Vangs repainted
- Furlers rebuilt by Reckmann
- Rewired electrics and antenna cables
- Antennas replaced
- Repainted booms and masts
- Hydraulic motors and boom vangs serviced
- Various rods replaced and all reheaded
- Runner’s replaced
- Report available for full details
- MTU main engine had full W6 with removal of engine from vessel complete rebuild at original manufacturer. This is considered a zero hour rebuild by MTU.
- Main Engine electronics, sensor, gauges and control system replaced
- Hundested variable pitch propeller system rebuilt by original manufacturer
- Generators remove and replace with new, incorporate into electronic monitoring system
- Day tank of 400 liters (105 gallons) with filtration system
- Diesel fill pump and gun for tender refil.
- Full engine room electrical rewire from source to distribution. New switch boards for 24v, 240v and 480v.
- Main Engine and Generator exhaust systems replaced.
- All tanks opened, cleaned and treated and painted.
- Replaced Bilge manifold with Cunnifer PVC
- Replaced all raw water PVC with Cunnifer PVC
- Fuel system replaced
- Helm panel updated and replaced
- Nilsson captive reel winches rebuilt
- Lewmar winches and Harken blocks rebuilt.
- Simpson Lawrence windlass rebuilt
- New tool boxes, parts boxes and power tools
- DC Emergency lighting installed, automatic with AC power failure
- Masts pulled for, complete disassembly,5-year inspection.
- Masts and booms painted
- Rod rigging reheaded and turnbuckles replaced
- Reckman furlers rebuilt by original manufacturer
- Bow and stern thruster removed and rebuilt
- Dropped rudder and replaced bearings, quadrant and cables
- Anchor chains replaced
- ASEA Shore power converter fitted
- Novec Engine room fire suppression system fitted (if used will not destroy electrics)
- Full hull and deck repaint.
DISCLAIMER
TENDER
Note: Subject to change and/or negotiation during the buying process.